Welcome to The Broadband Forum published resources Wiki. Please use the table and filters below to find the resource(s) you are looking for. All columns are sortable. The default sort order is "Date (descending)".
If you have a comment or question regarding the material on this page, please send email to [email protected].
Number | Type | Name | Work Area | Status | In Force | Supersedes | Date | More | |
---|---|---|---|---|---|---|---|---|---|
TR-022 | Technical Report | TR-022: The Operation of ADSL-based Networks | Operations & Network Management | In Force | TR-022 | 1999/08 | |||
TR-024 | Technical Report | TR-024: DMT Line Code Specific MIB | Operations & Network Management | In Force | TR-024 | 1999/06 | |||
TR-028 | Technical Report | TR-028: CMIP Specification for ADSL Network Element Management | Operations & Network Management | In Force | TR-028 | 1999/05 | |||
TR-015 | Technical Report | TR-015: CAP Line Code Specific MIB | Operations & Network Management | In Force | TR-015 | 1999/02 | |||
TR-005 | Technical Report | TR-005: ADSL Network Element Management | Operations & Network Management | In Force | TR-005 | 1998/03 | |||
TR-004 | Technical Report | TR-004: Network Migration | Operations & Network Management | In Force | TR-004 | 1997/12 | |||
af-pnni-0081.000 | ATM Forum Specification | af-pnni-0081.000: PNNI v1.0 Errata and PICs | P-NNI | In Force | af-pnni-0081.000 | 1997/05 | |||
af-pnni-0075.000 | ATM Forum Specification | af-pnni-0075.000: Addendum to PNNI V1.0 for ABR parameter negotiation | P-NNI | In Force | af-pnni-0075.000 | 1997/01 | |||
af-pnni-0066.000 | ATM Forum Specification | af-pnni-0066.000: Private Network-Network Interface Specification Version 1.0 Addendum (Soft PVC MIB) | P-NNI | In Force | af-pnni-0066.000 | 1996/09 | |||
af-pnni-0055.000 | ATM Forum Specification | af-pnni-0055.000: Private Network-Network Interface Specification V. 1.0 | P-NNI | In Force | af-pnni-0055.000 | 1996/03 | |||
af-pnni-0026.000 | ATM Forum Specification | af-pnni-0026.000: Interim Inter-Switch Signaling Protocol (IISP) Specification v1.0 | P-NNI | In Force | af-pnni-0026.000 | 1994/12 | |||
TR-011 | Technical Report | TR-011: An End-to-End Packet Mode Architecture with Tunneling and Service Selection | Packet Mode | In Force | TR-011 | 1998/06 | |||
TR-008 | Technical Report | TR-008: Default VPI/VCI addresses for FUNI Mode Transport: Packet Mode | Packet Mode | In Force | TR-008 | 1998/03 | |||
TR-009 | Technical Report | TR-009: Channelization for DMT and CAP ADSL Line Codes: Packet Mode | Packet Mode | In Force | TR-009 | 1998/03 | |||
TR-003 | Technical Report | TR-003: Framing and Encapsulation Standards for ADSL: Packet Mode | Packet Mode | In Force | TR-003 | 1997/06 | |||
af-phy-0133.001 | ATM Forum Specification | af-phy-0133.001: 2.5 and 10 Gbps Physical Layer Specification | Physical Layer | In Force | af-phy-0133.001 | af-phy-0133.000 | 2003/10 | ||
af-phy-0162.000 | ATM Forum Specification | af-phy-0162.000: Cell-Based 100 Mbit/s (CB1G) Physical Layer Specification over Single-mode or Multi-mode Fiber and Category 6 Twisted pair Copper Cabling | Physical Layer | In Force | af-phy-0162.000 | 2001/04 | |||
af-phy-0144.001 | ATM Forum Specification | af-phy-0144.001: UTOPIA Level 4 | Physical Layer | In Force | af-phy-0144.001 | 2000/03 | |||
af-phy-0143.000 | ATM Forum Specification | af-phy-0143.000: Frame-Based ATM Interface (Level 3) | Physical Layer | In Force | af-phy-0143.000 | 2000/03 | |||
af-phy-0142.000 | ATM Forum Specification | af-phy-0142.000: Multiplexed Status Mode (MSM3) for UTOPIA Level 3 | Physical Layer | In Force | af-phy-0142.000 | 2000/03 | |||
af-phy-0138.000 | ATM Forum Specification | af-phy-0138.000: Specification of the Device Control Protocol (DCP) Version 1.0 | Physical Layer | In Force | af-phy-0138.000 | 2000/02 | |||
af-phy-0136.000 | ATM Forum Specification | af-phy-0136.000: Utopia 3 Physical Layer Interface | Physical Layer | In Force | af-phy-0136.000 | 1999/11 | |||
af-phy-0134.000 | ATM Forum Specification | af-phy-0134.000: Physical Layer Control | Physical Layer | In Force | af-phy-0134.000 | 1999/10 | |||
af-phy-0133.000 | ATM Forum Specification | af-phy-0133.000: 2.4 Gbps Physical Layer Specification | Physical Layer | Superseded | af-phy-0133.001 | 1999/10 | |||
af-phy-0130.000 | ATM Forum Specification | af-phy-0130.000: ATM on Fractional E1/T1 | Physical Layer | In Force | af-phy-0130.000 | 1999/10 | |||
af-phy-0128.000 | ATM Forum Specification | af-phy-0128.000: 622 and 2488 Mbit/s Cell-Based Physical Layer | Physical Layer | In Force | af-phy-0128.000 | 1999/07 | |||
af-phy-0086.001 | ATM Forum Specification | af-phy-0086.001: Inverse Muliplexing for ATM (IMA) Specification Version 1.1 | Physical Layer | In Force | af-phy-0086.001 | af-phy-0086.000 | 1999/03 | ||
af-phy-0110.000 | ATM Forum Specification | af-phy-0110.000: Physical Layer High Density Glass Optical Fiber Connector Annex | Physical Layer | In Force | af-phy-0110.000 | 1999/02 | |||
af-phy-0079.001 | ATM Forum Specification | af-phy-0079.001: 155 Mb/s Plastic Optical Fiber and Hard Polymer Clad Fiber PMD Specification Version 1.1 | Physical Layer | In Force | af-phy-0079.001 | 1999/01 | |||
af-phy-0086.000 | ATM Forum Specification | af-phy-0086.000: Inverse Multiplexing for ATM (IMA) Specification Version 1.0 | Physical Layer | Superseded | af-phy-0086.001 | 1997/07 | |||
af-phy-0064.000 | ATM Forum Specification | af-phy-0064.000: E-1 Physical Interface Specification | Physical Layer | In Force | af-phy-0064.000 | 1996/09 | |||
af-phy-0063.000 | ATM Forum Specification | af-phy-0063.000: WIRE (PMD to TC layers) | Physical Layer | In Force | af-phy-0063.000 | 1996/07 | |||
af-phy-0062.000 | ATM Forum Specification | af-phy-0062.000: 155.52 Mbps Physical Layer Interface Specification for Short Wavelength Laser | Physical Layer | In Force | af-phy-0062.000 | 1996/07 | |||
af-phy-0054.000 | ATM Forum Specification | af-phy-0054.000: DS3 Physical Layer Interface Specification | Physical Layer | In Force | af-phy-0054.000 | 1996/01 | |||
af-phy-0053.000 | ATM Forum Specification | af-phy-0053.000: Addendum to ATM Physical Medium Dependent Interface Specification for 155 Mb/s over Twisted Pair Cable | Physical Layer | In Force | af-phy-0053.000 | 1996/01 | |||
af-phy-0046.000 | ATM Forum Specification | af-phy-0046.000: 622.08 Mbps Physical Layer Specification | Physical Layer | In Force | af-phy-0046.000 | 1996/01 | |||
af-phy-0047.000 | ATM Forum Specification | af-phy-0047.000: 155.52 Mb/s Physical Layer Specification for Category-3 Unshielded Twisted Pair | Physical Layer | In Force | af-phy-0047.000 | 1995/11 | |||
af-phy-0043.000 | ATM Forum Specification | af-phy-0043.000: A Cell-Based Transmission Convergence Sublayer for Clear Channel Interfaces | Physical Layer | In Force | af-phy-0043.000 | 1995/11 | |||
af-phy-0040.000 | ATM Forum Specification | af-phy-0040.000: Physical Interference Specification for 25.6 Mb/s over Twisted Pair Cable | Physical Layer | In Force | af-phy-0040.000 | 1995/11 | |||
af-phy-0034.000 | ATM Forum Specification | af-phy-0034.000: E3 Public UNI | Physical Layer | In Force | af-phy-0034.000 | 1995/08 | |||
af-phy-0039.000 | ATM Forum Specification | af-phy-0039.000: Utopia Level 2 | Physical Layer | In Force | af-phy-0039.000 | 1995/06 | |||
af-phy-0029.000 | ATM Forum Specification | af-phy-0029.000: 6,312 Kbps UNI Specification V 1.0 | Physical Layer | In Force | af-phy-0029.000 | 1995/06 | |||
af-phy-0018.000 | ATM Forum Specification | af-phy-0018.000: Mid-range Physical Layer Specification for Category 3 Unshielded Twisted-Pair | Physical Layer | In Force | af-phy-0018.000 | 1994/09 | |||
af-phy-0016.000 | ATM Forum Specification | af-phy-0016.000: DS1 Physical Layer Specification | Physical Layer | In Force | af-phy-0016.000 | 1994/09 | |||
af-phy-0015.000 | ATM Forum Specification | af-phy-0015.000: ATM Physical Medium Dependent Interface Specification for 155 Mb/s over Twisted Pair Cable | Physical Layer | In Force | af-phy-0015.000 | 1994/09 | |||
af-phy-0017.000 | ATM Forum Specification | af-phy-0017.000: Utopia | Physical Layer | In Force | af-phy-0017.000 | 1993/03 | |||
TR-285i2c1 | Technical Report | TR-285 Issue 2 Corrigendum 1: Broadband Copper Cable Models | Physical Layer Transmission (PHYtx) | In Force | TR-285i2 / TR-285i2c1 / TR-285i2a1 | 2024/10 | |||
TR-301i2a3 | Technical Report | TR-301 Issue 2 Amendment 3: Architecture and Requirements for Fiber to the Distribution Point | Physical Layer Transmission (PHYtx) | In Force | TR-301i2a3 | TR-301i2a2 | 2024/09 | ||
TR-301i2a2 | Technical Report | TR-301 Issue 2 Amendment 2: Architecture and Requirements for Fiber to the Distribution Point | Physical Layer Transmission (PHYtx) | Superseded | TR-301i2a3 | TR-301i2a1 | 2023/12 | ||
TR-476 | Technical Report | TR-476: G.hn Access Performance Test Plan | Physical Layer Transmission (PHYtx) | In Force | TR-476 | 2023/03 | |||
TR-285i2a1 | Technical Report | TR-285 Issue 2 Amendment 1: Broadband Copper Cable Models | Physical Layer Transmission (PHYtx) | In Force | TR-285i2 / TR-285i2c1 / TR-285i2a1 | 2023/02 | |||
TP-337i4c1 | Test Plan | TP-337 Issue 4 Corrigendum 1: G.fast Certification Test Plan | Physical Layer Transmission (PHYtx) | In Force | TP-337i4 / TP-337i4c1 | 2023/01 | |||
TR-338i3 | Technical Report | TR-338 Issue 3: Reverse Power Feed Testing | Physical Layer Transmission (PHYtx) | In Force | TR-338i3 | TR-338i2 | 2022/11 | ||
TR-419i2 | Technical Report | TR-419 Issue 2: Fiber Access Extension over Existing Copper Infrastructure | Physical Layer Transmission (PHYtx) | In Force | TR-419i2 | TR-419 | 2022/06 | ||
TP-337i4 | Test Plan | TP-337 Issue 4: G.fast Certification Test Plan | Physical Layer Transmission (PHYtx) | In Force | TP-337i4 / TP-337i4c1 | TP-337i3 | 2022/06 | ||
TR-380i2 | Technical Report | TR-380 Issue 2: G.fast Performance Test Plan | Physical Layer Transmission (PHYtx) | In Force | TR-380i2 | TR-380 | 2021/06 | ||
TP-337i3c1 | Test Plan | TP-337 Issue 3 Corrigendum 1: G.fast Certification Test Plan | Physical Layer Transmission (PHYtx) | Superseded | TP-337i4 / TP-337i4c1 | 2021/05 | |||
MR-419 | Marketing Report | MR-419: Utilizing Existing Copper Infrastructure for Deployment of Fiber-grade Services | Physical Layer Transmission (PHYtx) | In Force | MR-419 | 2021/01 | |||
TR-419 | Technical Report | TR-419: Fiber Access Extension over Existing Copper Infrastructure | Physical Layer Transmission (PHYtx) | Superseded | TR-419i2 | 2020/12 | |||
TP-337i3 | Test Plan | TP-337 Issue 3: G.fast Certification Test Plan | Physical Layer Transmission (PHYtx) | Superseded | TP-337i4 / TP-337i4c1 | TP-337i2a1 | 2020/12 | ||
TR-338i2 | Technical Report | TR-338 Issue 2: Reverse Power Feed Testing | Physical Layer Transmission (PHYtx) | Superseded | TR-338i3 | TR-338 | 2020/08 | ||
TR-380 | Technical Report | TR-380: G.fast Performance Test Plan | Physical Layer Transmission (PHYtx) | Superseded | TR-380i2 | 2020/06 | |||
TR-301i2a1 | Technical Report | TR-301 Issue 2 Amendment 1: Architecture and Requirements for Fiber to the Distribution Point | Physical Layer Transmission (PHYtx) | Superseded | TR-301i2a3 | TR-301i2c1 | 2020/04 | ||
TR-249i2 | Technical Report | TR-249 Issue 2: Testing of G.993.2 Self-FEXT Cancellation (vectoring) | Physical Layer Transmission (PHYtx) | In Force | TR-249i2 | TR-249 | 2020/01 | ||
TP-337i2a1 | Test Plan | TP-337 Issue 2 Amendment 1: G.fast Certification Test Plan | Physical Layer Transmission (PHYtx) | Superseded | TP-337i4 / TP-337i4c1 | ATP-337i2 | 2020/01 | ||
TR-208i3 | Technical Report | TR-208 Issue 3: Performance Test Plan For In-Premises Powerline Communications Systems | Physical Layer Transmission (PHYtx) | In Force | TR-208i3 | TR-208i2 | 2019/11 | ||
TR-115i3a2 | Technical Report | TR-115 Issue 3 Amendment 2: VDSL2 Functionality Test Plan | Physical Layer Transmission (PHYtx) | In Force | TR-115i3 / TR-115i3a1 / TR-115i3a2 | 2019/11 | |||
TR-114i3a3 | Technical Report | TR-114 Issue 3 Amendment 3: VDSL2 Performance Test Plan | Physical Layer Transmission (PHYtx) | In Force | TR-114i3 / TR-114i3a1 / TR-114i3a2 / TR-114i3a3 / TR-114i3a4 | 2019/11 | ZIP | ||
TR-338a1 | Technical Report | TR-338 Amendment 1: Reverse Power Feed Testing | Physical Layer Transmission (PHYtx) | Superseded | TR-338i3 | 2019/09 | |||
TR-285i2 | Technical Report | TR-285 Issue 2: Broadband Copper Cable Models | Physical Layer Transmission (PHYtx) | In Force | TR-285i2 / TR-285i2c1 / TR-285i2a1 | TR-285 | 2019/09 | ZIP | |
ATP-337i2 | Abstract Test Plan | ATP-337 Issue 2: G.fast Certification Test Plan | Physical Layer Transmission (PHYtx) | Superseded | TP-337i4 / TP-337i4c1 | ATP-337 | 2019/08 | ||
TR-285c2 | Technical Report | TR-285 Corrigendum 2: Broadband Copper Cable Models | Physical Layer Transmission (PHYtx) | Superseded | TR-285i2 / TR-285i2c1 / TR-285i2a1 | 2019/03 | |||
TR-338 | Technical Report | TR-338: Reverse Power Feed Testing | Physical Layer Transmission (PHYtx) | Superseded | TR-338i3 | 2018/07 | |||
TR-114i3a4 | Technical Report | TR-114 Issue 3 Amendment 4: VDSL2 Performance Test Plan | Physical Layer Transmission (PHYtx) | In Force | TR-114i3 / TR-114i3a1 / TR-114i3a2 / TR-114i3a3 / TR-114i3a4 | 2018/06 | |||
TR-347 | Technical Report | TR-347: CPE SELT (Single-End Line Testing) Calibration | Physical Layer Transmission (PHYtx) | In Force | TR-347 | 2018/06 | |||
TR-115i3a1 | Technical Report | TR-115 Issue 3 Amendment 1: VDSL2 Functionality Test Plan | Physical Layer Transmission (PHYtx) | In Force | TR-115i3 / TR-115i3a1 / TR-115i3a2 | 2018/05 | |||
TR-114i3a2 | Technical Report | TR-114 Issue 3 Amendment 2: VDSL2 Performance Test Plan | Physical Layer Transmission (PHYtx) | In Force | TR-114i3 / TR-114i3a1 / TR-114i3a2 / TR-114i3a3 / TR-114i3a4 | 2018/05 | ZIP | ||
TR-400 | Technical Report | TR-400: Testing of Bonded, Multi-Pair G.fast Systems | Physical Layer Transmission (PHYtx) | In Force | TR-400 | 2018/05 | |||
ATP-337 | Abstract Test Plan | ATP-337: G.fast Certification Abstract Test Plan | Physical Layer Transmission (PHYtx) | Superseded | TP-337i4 / TP-337i4c1 | 2017/07 | |||
TR-114i3a1 | Technical Report | TR-114 Issue 3 Amendment 1: VDSL2 Performance Test Plan | Physical Layer Transmission (PHYtx) | In Force | TR-114i3 / TR-114i3a1 / TR-114i3a2 / TR-114i3a3 / TR-114i3a4 | 2017/05 | |||
TR-114i3 | Technical Report | TR-114 Issue 3: VDSL2 Performance Test Plan | Physical Layer Transmission (PHYtx) | In Force | TR-114i3 / TR-114i3a1 / TR-114i3a2 / TR-114i3a3 / TR-114i3a4 | TR-114i2 | 2017/03 | ZIP | |
TR-208i2 | Technical Report | TR-208 Issue 2: Performance Test Plan For In-premises Powerline Communication Systems | Physical Layer Transmission (PHYtx) | Superseded | TR-208i3 | TR-208 | 2017/03 | ||
TR-285a1 | Technical Report | TR-285 Amendment 1: Broadband Copper Cable Models | Physical Layer Transmission (PHYtx) | Superseded | TR-285i2 / TR-285i2c1 / TR-285i2a1 | 2017/03 | |||
TR-273a1 | Technical Report | TR-273 Amendment 1: Testing of Bonded, Multi-Pair xDSL Systems | Physical Layer Transmission (PHYtx) | In Force | TR-273 / TR-273c1 / TR-273a1 | 2016/10 | |||
TR-115i3 | Technical Report | TR-115 Issue 3: VDSL2 Functionality Test Plan | Physical Layer Transmission (PHYtx) | In Force | TR-115i3 / TR-115i3a1 / TR-115i3a2 | TR-115i2 | 2016/01 | ZIP | |
TR-285c1 | Technical Report | TR-285 Corrigendum 1: Broadband Copper Cable Models | Physical Layer Transmission (PHYtx) | Superseded | TR-285i2 / TR-285i2c1 / TR-285i2a1 | 2015/11 | |||
TR-208 | Technical Report | TR-208: Performance Test Plan For In-premises Powerline Communication Systems | Physical Layer Transmission (PHYtx) | Superseded | TR-208i3 | 2015/08 | |||
TR-105i2a2 | Technical Report | TR-105 Issue 2 Amendment 2: ADSL2/ADSL2plus Functionality Test Plan | Physical Layer Transmission (PHYtx) | In Force | TR-105i2 / TR-105i2a1 / TR-105i2a2 | 2015/06 | |||
TR-285 | Technical Report | TR-285: Broadband Copper Cable Models | Physical Layer Transmission (PHYtx) | Superseded | TR-285i2 / TR-285i2c1 / TR-285i2a1 | 2015/02 | |||
TR-100i3a1 | Technical Report | TR-100 Issue 3 Amendment 1: ADSL2/ADSL2plus Performance Test Plan | Physical Layer Transmission (PHYtx) | In Force | TR-100i3 / TR-100i3a1 | 2015/02 | |||
TR-138a1 | Technical Report | TR-138 Amendment 1: Accuracy Tests for Test Parameters | Physical Layer Transmission (PHYtx) | In Force | TR-138 / TR-138c1 / TR-138a1 | 2014/09 | |||
TR-249a1 | Technical Report | TR-249 Amendment 1: Testing of G.993.2 Self-FEXT Cancellation (vectoring) | Physical Layer Transmission (PHYtx) | Superseded | TR-249i2 | 2014/09 | |||
TR-273c1 | Technical Report | TR-273 Corrigendum 1: Testing of Bonded, Multi-Pair xDSL Systems | Physical Layer Transmission (PHYtx) | In Force | TR-273 / TR-273c1 / TR-273a1 | 2014/09 | |||
TR-100i3 | Technical Report | TR-100 Issue 3: ADSL2/ADSL2plus Performance Test Plan | Physical Layer Transmission (PHYtx) | In Force | TR-100i3 / TR-100i3a1 | TR-100i2 | 2014/09 | ||
TR-115i2c2 | Technical Report | TR-115 Issue 2 Corrigendum 2: VDSL2 Functionality Test Plan | Physical Layer Transmission (PHYtx) | Superseded | TR-115i3 / TR-115i3a1 / TR-115i3a2 | 2014/06 | ZIP | ||
TR-320 | Technical Report | TR-320: Techniques to Mitigate Uncancelled Crosstalk on Vectored VDSL2 Lines | Physical Layer Transmission (PHYtx) | In Force | TR-320 | 2014/03 | |||
TR-115i2c1 | Technical Report | TR-115 Issue 2 Corrigendum 1: VDSL2 Functionality Test Plan | Physical Layer Transmission (PHYtx) | Superseded | TR-115i3 / TR-115i3a1 / TR-115i3a2 | 2014/03 | |||
TR-249 | Technical Report | TR-249: Testing of G.993.2 Self-FEXT Cancellation (vectoring) | Physical Layer Transmission (PHYtx) | Superseded | TR-249i2 | 2014/03 | |||
TR-286a1 | Technical Report | TR-286 Amendment 1: Testing of Metallic Line Testing (MELT) functionality on xDSL Ports | Physical Layer Transmission (PHYtx) | In Force | TR-286 / TR-286a1 | 2014/03 | |||
TR-115i2a1 | Technical Report | TR-115 Issue 2 Amendment 1: VDSL2 Functionality Test Plan | Physical Layer Transmission (PHYtx) | Superseded | TR-115i3 / TR-115i3a1 / TR-115i3a2 | 2013/05 |