Welcome to The Broadband Forum published resources Wiki. Please use the table and filters below to find the resource(s) you are looking for. All columns are sortable. The default sort order is "Date (descending)".
If you have a comment or question regarding the material on this page, please send email to [email protected].
Number | Type | Name | Work Area | Status | In Force | Supersedes | Date | More | |
---|---|---|---|---|---|---|---|---|---|
TR-355 | Technical Report | TR-355: YANG Modules for FTTdp Management | Fiber to the Distribution Point | Superseded | TR-355a4 | 2016/07 | More | ||
TR-355c2 | Technical Report | TR-355 Corrigendum 2: YANG Modules for FTTdp Management | Common YANG | Superseded | TR-355a4 | TR-355 | 2017/11 | More | |
TR-355c1 | Technical Report | TR-355 Corrigendum 1: YANG Modules for FTTdp Management | Fiber to the Distribution Point | Superseded | TR-355a4 | TR-355 | 2017/03 | More | |
TR-355a4 | Technical Report | TR-355 Amendment 4: YANG Modules for FTTdp Management | Common YANG | In Force | TR-355a4 | TR-355a3 | 2022/05 | More | |
TR-355a3 | Technical Report | TR-355 Amendment 3: YANG Modules for FTTdp Management | Common YANG | Superseded | TR-355a4 | TR-355a2 | 2020/10 | More | |
TR-355a2 | Technical Report | TR-355 Amendment 2: YANG Modules for FTTdp Management | Common YANG | Superseded | TR-355a4 | TR-355a1 | 2019/06 | More | |
TR-355a1 | Technical Report | TR-355 Amendment 1: YANG Modules for FTTdp Management | Common YANG | Superseded | TR-355a4 | TR-355 | 2018/10 | More | |
TR-352 | Technical Report | TR-352: Multi-wavelength PON Inter-Channel-Termination Protocol (ICTP) Specification | Fiber Access Networks (FAN) | Superseded | TR-352i2 / TR-352i2c1 | 2017/03 | |||
TR-352i2 | Technical Report | TR-352 Issue 2: Multi-wavelength PON Inter-Channel-Termination Protocol (ICTP) Specification | Fiber Access Networks (FAN) | In Force | TR-352i2 / TR-352i2c1 | TR-352 | 2020/09 | ||
TR-352i2c1 | Technical Report | TR-352 Issue 2 Corrigendum 1: Multi-wavelength PON Inter-Channel-Termination Protocol (ICTP) Specification | Fiber Access Networks (FAN) | In Force | TR-352i2 / TR-352i2c1 | 2021/10 | |||
TR-350 | Technical Report | TR-350: Ethernet Services using BGP MPLS Based Ethernet VPNs (EVPN) | Access and Transport Architecture (ATA) | Superseded | TR-350i2 | 2015/11 | |||
TR-350i2 | Technical Report | TR-350 Issue 2: Ethernet Services Using BGP MPLS Based Ethernet VPNs (EVPN) | Fiber Access Networks (FAN) | In Force | TR-350i2 | TR-350 | 2018/10 | ||
TR-349 | Technical Report | TR-349: DSL Data Sharing | Access and Transport Architecture (ATA) | In Force | TR-349 | 2016/07 | |||
TR-348 | Technical Report | TR-348: Hybrid Access Broadband Network Architecture | Wireless Wireline Convergence (WWC) | In Force | TR-348 | 2016/07 | |||
TR-347 | Technical Report | TR-347: CPE SELT (Single-End Line Testing) Calibration | Physical Layer Transmission (PHYtx) | In Force | TR-347 | 2018/06 | |||
TR-345 | Technical Report | TR-345: Broadband Network Gateway and Network Function Virtualization | Access and Transport Architecture (ATA) | In Force | TR-345 | 2016/10 | |||
TR-341 | Technical Report | TR-341: Radius Attributes Catalog | Wireless Wireline Convergence (WWC) | In Force | TR-341 | 2016/07 | |||
TR-338 | Technical Report | TR-338: Reverse Power Feed Testing | Physical Layer Transmission (PHYtx) | Superseded | TR-338i3 | 2018/07 | |||
TR-338i3 | Technical Report | TR-338 Issue 3: Reverse Power Feed Testing | Physical Layer Transmission (PHYtx) | In Force | TR-338i3 | TR-338i2 | 2022/11 | ||
TR-338i2 | Technical Report | TR-338 Issue 2: Reverse Power Feed Testing | Physical Layer Transmission (PHYtx) | Superseded | TR-338i3 | TR-338 | 2020/08 | ||
TR-338a1 | Technical Report | TR-338 Amendment 1: Reverse Power Feed Testing | Physical Layer Transmission (PHYtx) | Superseded | TR-338i3 | 2019/09 | |||
TR-331 | Technical Report | TR-331: Architecture and Technical Requirements for PON-Based Mobile Backhaul Networks | Fiber Access Networks (FAN) | Superseded | TR-331i2 | 2018/03 | |||
TR-331i2 | Technical Report | TR-331 Issue 2: Architecture and Technical Requirements for PON based Mobile Backhaul Networks | Fiber Access Networks (FAN) | In Force | TR-331i2 | TR-331 | 2024/11 | ||
TR-330 | Technical Report | TR-330: TR-069 UPnP DM Proxy Management Guidelines | Broadband User Services (BUS) | In Force | TR-330 | 2014/08 | |||
TR-328 | Technical Report | TR-328: Virtual Business Gateway | SDN and NFV | In Force | TR-328 | 2017/07 | |||
TR-321 | Technical Report | TR-321: Public Wi-Fi Access in Multi-service Broadband Networks | Access and Transport Architecture (ATA) | In Force | TR-321 | 2015/11 | |||
TR-320 | Technical Report | TR-320: Techniques to Mitigate Uncancelled Crosstalk on Vectored VDSL2 Lines | Physical Layer Transmission (PHYtx) | In Force | TR-320 | 2014/03 | |||
TR-319pB | Technical Report | TR-319pB: Achieving Packet Network Optimization using DWDM Interfaces – Physically Separated Model | Access and Transport Architecture (ATA) | In Force | TR-319pB | 2016/04 | |||
TR-319pA | Technical Report | TR-319pA: Achieving Packet Network Optimization using DWDM Interfaces – Physically Integrated Model | IPMPLS & Core | In Force | TR-319pA | 2015/06 | |||
TR-319Base | Technical Report | TR-319Base: Achieving Packet Network Optimization using DWDM Interfaces | IPMPLS & Core | In Force | TR-319Base | 2015/06 | |||
TR-317 | Technical Report | TR-317: Network Enhanced Residential Gateway | Access and Transport Architecture (ATA) | In Force | TR-317 | 2016/07 | |||
TR-311 | Technical Report | TR-311: Fiber Infrastructure Management System: Architecture and Requirements | Operations & Network Management | In Force | TR-311 | 2015/02 | |||
TR-309 | Technical Report | TR-309: XG-PON1 TC Layer Interoperability Test Plan | Fiber Access Networks (FAN) | Superseded | TR-309i3 | 2013/09 | |||
TR-309i3 | Technical Report | TR-309 Issue 3: PON TC Layer Interoperability Test Plan | Fiber Access Networks (FAN) | In Force | TR-309i3 | TR-309i2a1 | 2024/06 | ||
TR-309i2 | Technical Report | TR-309 Issue 2: XG-PON and XGS-PON TC Layer Interoperability Test Plan | Fiber Access Networks (FAN) | Superseded | TR-309i3 | TR-309 | 2018/12 | ||
TR-309i2a1 | Technical Report | TR-309 Issue 2 Amendment 1: XG-PON and XGS-PON TC Layer Interoperability Test Plan | Fiber Access Networks (FAN) | Superseded | TR-309i3 | TR-309i2 | 2020/05 | ||
TR-304 | Technical Report | TR-304: Broadband Access Service Attributes and Performance Metrics | Operations & Network Management | In Force | TR-304 | 2015/02 | |||
TR-301 | Technical Report | TR-301: Architecture and Requirements for Fiber to the Distribution Point | Fiber Access Networks (FAN) | Superseded | TR-301i2a3 | 2015/08 | |||
TR-301i2 | Technical Report | TR-301 Issue 2: Architecture and Requirements for Fiber to the Distribution Point | Fiber to the Distribution Point | Superseded | TR-301i2a3 | TR-301 | 2017/03 | ||
TR-301i2c1 | Technical Report | TR-301 Issue 2 Corrigendum 1: Architecture and Requirements for Fiber to the Distribution Point | Fiber Access Networks (FAN) | Superseded | TR-301i2a3 | TR-301i2 | 2019/03 | ||
TR-301i2a3 | Technical Report | TR-301 Issue 2 Amendment 3: Architecture and Requirements for Fiber to the Distribution Point | Physical Layer Transmission (PHYtx) | In Force | TR-301i2a3 | TR-301i2a2 | 2024/09 | ||
TR-301i2a2 | Technical Report | TR-301 Issue 2 Amendment 2: Architecture and Requirements for Fiber to the Distribution Point | Physical Layer Transmission (PHYtx) | Superseded | TR-301i2a3 | TR-301i2a1 | 2023/12 | ||
TR-301i2a1 | Technical Report | TR-301 Issue 2 Amendment 1: Architecture and Requirements for Fiber to the Distribution Point | Physical Layer Transmission (PHYtx) | Superseded | TR-301i2a3 | TR-301i2c1 | 2020/04 | ||
TR-300 | Technical Report | TR-300: Policy Convergence for Next Generation Fixed and 3GPP Wireless Networks | Access and Transport Architecture (ATA) | In Force | TR-300 | 2014/09 | |||
TR-298 | Technical Report | TR-298: Management model for DSL line test | Operations & Network Management | Superseded | TR-298i2 | 2013/09 | |||
TR-298i2 | Technical Report | TR-298 Issue 2: Management model for DSL line test | Fiber to the Distribution Point | In Force | TR-298i2 | TR-298 | 2017/03 | ||
TR-296 | Technical Report | TR-296: IPv6 Transition Mechanisms Test Plan | Access and Transport Architecture (ATA) | In Force | TR-296 | 2013/11 | |||
TR-293 | Technical Report | TR-293: Energy Efficient Mobile Backhaul | IPMPLS & Core | In Force | TR-293 | 2014/09 | |||
TR-292 | Technical Report | TR-292: Abstract Test Suite For MPLS OAM | IPMPLS & Core | In Force | TR-292 | 2015/06 | |||
TR-291 | Technical Report | TR-291: Nodal Requirements for Interworking between Next Generation Fixed and 3GPP Wireless Access | Access and Transport Architecture (ATA) | In Force | TR-291 | 2014/03 | |||
TR-287 | Technical Report | TR-287: PON Optical-Layer Management | Fiber Access Networks (FAN) | Superseded | TR-287i2 | 2014/06 | |||
TR-287i2 | Technical Report | TR-287 Issue 2: PON Optical-Layer Management | Fiber Access Networks (FAN) | In Force | TR-287i2 | TR-287 | 2017/09 | ||
TR-286 | Technical Report | TR-286: Testing of Metallic Line Testing (MELT) functionality on xDSL Ports | Physical Layer Transmission (PHYtx) | In Force | TR-286 / TR-286a1 | 2012/11 | |||
TR-286a1 | Technical Report | TR-286 Amendment 1: Testing of Metallic Line Testing (MELT) functionality on xDSL Ports | Physical Layer Transmission (PHYtx) | In Force | TR-286 / TR-286a1 | 2014/03 | |||
TR-285 | Technical Report | TR-285: Broadband Copper Cable Models | Physical Layer Transmission (PHYtx) | Superseded | TR-285i2 / TR-285i2c1 / TR-285i2a1 | 2015/02 | |||
TR-285i2 | Technical Report | TR-285 Issue 2: Broadband Copper Cable Models | Physical Layer Transmission (PHYtx) | In Force | TR-285i2 / TR-285i2c1 / TR-285i2a1 | TR-285 | 2019/09 | ZIP | |
TR-285i2c1 | Technical Report | TR-285 Issue 2 Corrigendum 1: Broadband Copper Cable Models | Physical Layer Transmission (PHYtx) | In Force | TR-285i2 / TR-285i2c1 / TR-285i2a1 | 2024/10 | |||
TR-285i2a1 | Technical Report | TR-285 Issue 2 Amendment 1: Broadband Copper Cable Models | Physical Layer Transmission (PHYtx) | In Force | TR-285i2 / TR-285i2c1 / TR-285i2a1 | 2023/02 | |||
TR-285c2 | Technical Report | TR-285 Corrigendum 2: Broadband Copper Cable Models | Physical Layer Transmission (PHYtx) | Superseded | TR-285i2 / TR-285i2c1 / TR-285i2a1 | 2019/03 | |||
TR-285c1 | Technical Report | TR-285 Corrigendum 1: Broadband Copper Cable Models | Physical Layer Transmission (PHYtx) | Superseded | TR-285i2 / TR-285i2c1 / TR-285i2a1 | 2015/11 | |||
TR-285a1 | Technical Report | TR-285 Amendment 1: Broadband Copper Cable Models | Physical Layer Transmission (PHYtx) | Superseded | TR-285i2 / TR-285i2c1 / TR-285i2a1 | 2017/03 | |||
TR-280 | Technical Report | TR-280: ITU-T PON in the context of TR-178 | Fiber Access Networks (FAN) | Superseded | TR-280i2 | 2016/10 | |||
TR-280i2 | Technical Report | TR-280 Issue 2: ITU-T PON in the Context of TR-178 | Fiber Access Networks (FAN) | In Force | TR-280i2 | TR-280 | 2022/03 | ||
TR-280c1 | Technical Report | TR-280 Corrigendum 1: ITU-T PON in the context of TR-178 | Fiber Access Networks (FAN) | Superseded | TR-280i2 | TR-280 | 2021/03 | ||
TR-280a1 | Technical Report | TR-280 Amendment 1: ITU-T PON in the context of TR-178 | Fiber Access Networks (FAN) | Superseded | TR-280i2 | TR-280 | 2020/04 | ||
TR-273 | Technical Report | TR-273: Testing of Bonded, Multi-Pair xDSL Systems | Physical Layer Transmission (PHYtx) | In Force | TR-273 / TR-273c1 / TR-273a1 | 2012/08 | |||
TR-273c1 | Technical Report | TR-273 Corrigendum 1: Testing of Bonded, Multi-Pair xDSL Systems | Physical Layer Transmission (PHYtx) | In Force | TR-273 / TR-273c1 / TR-273a1 | 2014/09 | |||
TR-273a1 | Technical Report | TR-273 Amendment 1: Testing of Bonded, Multi-Pair xDSL Systems | Physical Layer Transmission (PHYtx) | In Force | TR-273 / TR-273c1 / TR-273a1 | 2016/10 | |||
TR-272 | Technical Report | TR-272: BBF and TMF xDSL Management Specifications Alignment | Operations & Network Management | In Force | TR-272 | 2012/11 | |||
TR-262 | Technical Report | TR-262: Femto Component Objects | Broadband User Services (BUS) | In Force | TR-262 | 2011/11 | More | ||
TR-260 | Technical Report | TR-260: DCF Functional and Performance Test Plan | Operations & Network Management | Superseded | TR-260i2 | 2011/11 | |||
TR-260i2 | Technical Report | TR-260 Issue 2: DCF Functional and Performance Test Plan | Operations & Network Management | In Force | TR-260i2 | TR-260 | 2012/11 | ||
TR-255 | Technical Report | TR-255: GPON Interoperability Test Plan | Fiber Access Networks (FAN) | In Force | TR-255 | 2013/02 | |||
TR-254 | Technical Report | TR-254: Functionality Tests for Ethernet Based Access Nodes | Access and Transport Architecture (ATA) | In Force | TR-254 | 2012/07 | |||
TR-252 | Technical Report | TR-252: xDSL Protocol-Independent Management Model | Operations & Network Management | Superseded | TR-252i3 | 2010/11 | |||
TR-252i3 | Technical Report | TR-252 Issue 3: xDSL Protocol-Independent Management Model | Operations & Network Management | In Force | TR-252i3 | TR-252i2 | 2013/11 | ||
TR-252i2 | Technical Report | TR-252 Issue 2: xDSL Protocol-Independent Management Model | Operations & Network Management | Superseded | TR-252i3 | TR-252 | 2012/05 | ||
TR-249 | Technical Report | TR-249: Testing of G.993.2 Self-FEXT Cancellation (vectoring) | Physical Layer Transmission (PHYtx) | Superseded | TR-249i2 | 2014/03 | |||
TR-249i2 | Technical Report | TR-249 Issue 2: Testing of G.993.2 Self-FEXT Cancellation (vectoring) | Physical Layer Transmission (PHYtx) | In Force | TR-249i2 | TR-249 | 2020/01 | ||
TR-249a1 | Technical Report | TR-249 Amendment 1: Testing of G.993.2 Self-FEXT Cancellation (vectoring) | Physical Layer Transmission (PHYtx) | Superseded | TR-249i2 | 2014/09 | |||
TR-248/ATP-248 (IP/MPLS FORUM 23.0.0) | Technical Report | TR-248/ATP-248 (IP/MPLS FORUM 23.0.0): Abstract Test Suite for TDM Services over MPLS | IPMPLS & Core | In Force | TR-248/ATP-248 (IP/MPLS FORUM 23.0.0) | 2010/02 | |||
TR-247/ATP-247 | Technical Report | TR-247/ATP-247: Abstract Test Plan for GPON ONU Conformance | Fiber Access Networks (FAN) | Superseded | TP-247i4c1 | 2011/10 | |||
TR-242 | Technical Report | TR-242: IPv6 Transition Mechanisms for Broadband Networks | Access and Transport Architecture (ATA) | Superseded | TR-242i2 | 2012/08 | |||
TR-242i2 | Technical Report | TR-242 Issue 2: IPv6 Transition Mechanisms for Broadband Networks | Access and Transport Architecture (ATA) | In Force | TR-242i2 | TR-242 | 2015/02 | ||
TR-232 | Technical Report | TR-232: Bulk Data Collection | Broadband User Services (BUS) | In Force | TR-232 | 2012/05 | More | ||
TR-226 | Technical Report | TR-226: XML Layered and Performance Parameters in Support of TR-169 | Operations & Network Management | In Force | TR-226 | 2010/11 | |||
TR-224 | Technical Report | TR-224: Technical Specification for MPLS in Carrier Ethernet Networks | IPMPLS & Core | In Force | TR-224 | 2014/09 | |||
TR-223 | Technical Report | TR-223: Requirements for MPLS over Aggregated Interfaces (MPLSoAI) | IPMPLS & Core | In Force | TR-223 | 2012/08 | |||
TR-221 | Technical Report | TR-221: Technical Specifications for MPLS in Mobile Backhaul Networks | IPMPLS & Core | In Force | TR-221 / TR-221c1 / TR-221a1 / TR-221a2 | 2011/10 | |||
TR-221c1 | Technical Report | TR-221 Corrigendum 1: Technical Specifications for MPLS in Mobile Backhaul Networks | IPMPLS & Core | In Force | TR-221 / TR-221c1 / TR-221a1 / TR-221a2 | 2014/09 | |||
TR-221a2 | Technical Report | TR-221 Amendment 2: Technical Specifications for MPLS in Mobile Backhaul Networks | Access and Transport Architecture (ATA) | In Force | TR-221 / TR-221c1 / TR-221a1 / TR-221a2 | 2017/09 | |||
TR-221a1 | Technical Report | TR-221 Amendment 1: Technical Specifications for MPLS in Mobile Backhaul Networks | IPMPLS & Core | In Force | TR-221 / TR-221c1 / TR-221a1 / TR-221a2 | 2013/11 | |||
TR-208 | Technical Report | TR-208: Performance Test Plan For In-premises Powerline Communication Systems | Physical Layer Transmission (PHYtx) | Superseded | TR-208i3 | 2015/08 | |||
TR-208i3 | Technical Report | TR-208 Issue 3: Performance Test Plan For In-Premises Powerline Communications Systems | Physical Layer Transmission (PHYtx) | In Force | TR-208i3 | TR-208i2 | 2019/11 | ||
TR-208i2 | Technical Report | TR-208 Issue 2: Performance Test Plan For In-premises Powerline Communication Systems | Physical Layer Transmission (PHYtx) | Superseded | TR-208i3 | TR-208 | 2017/03 | ||
TR-207 | Technical Report | TR-207: Layer 2 Control Mechanism For Broadband Multi-Service Architectures part II | Access and Transport Architecture (ATA) | In Force | TR-207 | 2012/11 | |||
TR-203 | Technical Report | TR-203: Interworking between Next Generation Fixed and 3GPP Wireless Networks | Access and Transport Architecture (ATA) | In Force | TR-203 | 2012/08 | |||
TR-202 | Technical Report | TR-202: ADSL2/ADSL2plus Low-Power Mode Guidelines | Physical Layer Transmission (PHYtx) | In Force | TR-202 | 2010/02 | |||
TR-200c1 | Technical Report | TR-200 Corrigendum 1: Using EPON in the Context of TR-101 | Fiber Access Networks (FAN) | In Force | TR-200c1 | 2011/07 | |||
TR-198 | Technical Report | TR-198: DQS: DQM Systems Functional Architecture and Requirements | Operations & Network Management | Superseded | TR-198i2 | 2010/09 |