Welcome to The Broadband Forum published resources Wiki. Please use the table and filters below to find the resource(s) you are looking for. All columns are sortable. The default sort order is "Date (descending)".
If you have a comment or question regarding the material on this page, please send email to [email protected].
Number | Type | Name | Work Area | Status | In Force | Supersedes | Date | More | |
---|---|---|---|---|---|---|---|---|---|
MR-459.2 | Marketing Report | MR-459.2: Improving Service Resilience through BNG Disaggregation | Access and Transport Architecture (ATA) | In Force | MR-459.2 | 2020/03 | |||
TR-249i2 | Technical Report | TR-249 Issue 2: Testing of G.993.2 Self-FEXT Cancellation (vectoring) | Physical Layer Transmission (PHYtx) | In Force | TR-249i2 | TR-249 | 2020/01 | ||
TR-208i3 | Technical Report | TR-208 Issue 3: Performance Test Plan For In-Premises Powerline Communications Systems | Physical Layer Transmission (PHYtx) | In Force | TR-208i3 | TR-208i2 | 2019/11 | ||
TR-115i3a2 | Technical Report | TR-115 Issue 3 Amendment 2: VDSL2 Functionality Test Plan | Physical Layer Transmission (PHYtx) | In Force | TR-115i3 / TR-115i3a1 / TR-115i3a2 | 2019/11 | |||
TR-114i3a3 | Technical Report | TR-114 Issue 3 Amendment 3: VDSL2 Performance Test Plan | Physical Layer Transmission (PHYtx) | In Force | TR-114i3 / TR-114i3a1 / TR-114i3a2 / TR-114i3a3 / TR-114i3a4 | 2019/11 | ZIP | ||
TR-423i2 | Technical Report | TR-423 Issue 2: PON PMD Layer Conformance Test Plan | Fiber Access Networks (FAN) | In Force | TR-423i2 | TR-423 | 2019/10 | ||
MR-350i2 | Marketing Report | MR-350 Issue 2: Ethernet Virtual Private Networks for Integrated, Scalable Layer 2 and Layer 3 VPN Services | Access and Transport Architecture (ATA) | In Force | MR-350i2 | MR-350 | 2019/10 | ||
MR-464 | Marketing Report | MR-464: Migrating Fixed Access to 5G Core | Wireless Wireline Convergence (WWC) | In Force | MR-464 | 2019/10 | |||
MR-459 | Marketing Report | MR-459: Disaggregated BNG | Access and Transport Architecture (ATA) | In Force | MR-459 | 2019/10 | |||
MR-455 | Marketing Report | MR-455: Hybrid Access – Addressing Demand for Higher Broadband Performance | Access and Transport Architecture (ATA) | In Force | MR-455 | 2019/10 | |||
MR-452.1 | Marketing Report | MR-452.1: Motivation for Quality Verified Broadband Services | Access and Transport Architecture (ATA) | In Force | MR-452.1 | 2019/10 | |||
MR-421 | Marketing Report | MR-421: Protect Your Services with Application-Layer Testing | Access and Transport Architecture (ATA) | In Force | MR-421 | 2019/10 | |||
TR-285i2 | Technical Report | TR-285 Issue 2: Broadband Copper Cable Models | Physical Layer Transmission (PHYtx) | In Force | TR-285i2 / TR-285i2c1 / TR-285i2a1 | TR-285 | 2019/09 | ZIP | |
APPN-447 | Application Note | CloudCO-APPN-447: NERG Overlay LSL with vG_MUX PNF | SDN and NFV | In Force | APPN-447 | 2019/08 | |||
APPN-445 | Application Note | CloudCO-APPN-445: Monitoring, Diagnostics, and Optimization in a Residential Broadband System | SDN and NFV | In Force | APPN-445 | 2019/08 | |||
APPN-442 | Application Note | CloudCO-APPN-442: Value Added Service (VAS) Based on NERG | SDN and NFV | In Force | APPN-442 | 2019/08 | |||
APPN-441 | Application Note | CloudCO-APPN-441: Converged Core-as-a-Service (with PNF based User Plane) | SDN and NFV | In Force | APPN-441 | 2019/08 | |||
TR-421 | Technical Report | TR-421: Application-Layer Test Traffic Architecture and Requirements | Access and Transport Architecture (ATA) | In Force | TR-421 | 2019/08 | |||
MU-461 | Market Update | MU-461: Realizing the Promise of the Connected Home with User Services Platform (TR-369) | Broadband User Services (BUS) | In Force | MU-461 | 2019/05 | |||
TR-378 | Technical Report | TR-378: Nodal Requirements for Hybrid Access Broadband Networks | Wireless Wireline Convergence (WWC) | In Force | TR-378 | 2019/05 | |||
MU-449 | Market Update | MU-449: Service Providers Leveraging Gfast to Complement Fiber Optic Infrastructure | In Force | MU-449 | 2019/05 | ||||
MU-437 | Market Update | MU-437: The Future of Passive Optical Networking is Here NG-PON2 | In Force | MU-437 | 2019/05 | ||||
MR-453 | Marketing Report | MR-453: Fixed Access Network Sharing (FANS) | SDN and NFV | In Force | MR-453 | 2019/02 | |||
MU-438 | Market Update | MU-438: User Services Platform – The Journey to the Connected Home | In Force | MU-438 | 2019/02 | ||||
MU-439 | Market Update | MU-439: An Overview of the User Services Platform (USP) (Broadband Forum TR-369) | Broadband User Services (BUS) | In Force | MU-439 | 2018/12 | |||
TR-403 | Technical Report | TR-403: PON Abstraction Interface for Time-Critical Applications | SDN and NFV | In Force | TR-403 | 2018/12 | |||
TR-426 | Technical Report | TR-426: NG-PON2 TC Layer Interoperability Test Plan | Fiber Access Networks (FAN) | In Force | TR-426 | 2018/12 | |||
TR-413 | Technical Report | TR-413: SDN Management and Control Interfaces for CloudCO Network Functions | SDN and NFV | In Force | TR-413 | 2018/12 | |||
APPN-004 | Application Note | CloudCO-APPN-004: Activation and Initial Provisioning – Access Devices | In Force | APPN-004 | 2018/10 | ||||
APPN-007 | Application Note | CloudCO-APPN-007: SDN-based FANS Service | In Force | APPN-007 | 2018/10 | ||||
APPN-006 | Application Note | CloudCO-APPN-006: Virtual Access Node (vAN)-based FANS Service | In Force | APPN-006 | 2018/10 | ||||
APPN-003 | Application Note | CloudCO-APPN-003: Network Enhanced Residential Gateway (NERG) Service Initialization with Overlay Logical Subscriber Link (LSL) Connectivity | In Force | APPN-003 | 2018/10 | ||||
APPN-002 | Application Note | CloudCO-APPN-002: Network Enhanced Residential Gateway (NERG) Service Initialization with Flat Logical Subscriber Link (LSL) Connectivity | In Force | APPN-002 | 2018/10 | ||||
APPN-001 | Application Note | CloudCO-APPN-001: Establish High Speed Internet Access (HSIA) Service | In Force | APPN-001 | 2018/10 | ||||
MR-433 | Marketing Report | MR-433: The Key to Optimizing Quality of Experience | Access and Transport Architecture (ATA) | In Force | MR-433 | 2018/10 | |||
TR-402 | Technical Report | TR-402: Functional Model for PON Abstraction Interface | SDN and NFV | In Force | TR-402 | 2018/10 | |||
TR-350i2 | Technical Report | TR-350 Issue 2: Ethernet Services Using BGP MPLS Based Ethernet VPNs (EVPN) | Fiber Access Networks (FAN) | In Force | TR-350i2 | TR-350 | 2018/10 | ||
MR-430 | Marketing Report | MR-430: Cloud Central Office (CloudCO) | SDN and NFV | In Force | MR-430 | 2018/09 | |||
MR-432 | Marketing Report | MR-432: Fixed Access Network Sharing (FANS) | SDN and NFV | In Force | MR-432 | 2018/08 | |||
MR-427 | Marketing Report | MR-427: 5G Fixed-Mobile Convergence | Wireless Wireline Convergence (WWC) | In Force | MR-427 | 2018/07 | |||
TR-114i3a4 | Technical Report | TR-114 Issue 3 Amendment 4: VDSL2 Performance Test Plan | Physical Layer Transmission (PHYtx) | In Force | TR-114i3 / TR-114i3a1 / TR-114i3a2 / TR-114i3a3 / TR-114i3a4 | 2018/06 | |||
TR-347 | Technical Report | TR-347: CPE SELT (Single-End Line Testing) Calibration | Physical Layer Transmission (PHYtx) | In Force | TR-347 | 2018/06 | |||
TR-374 | Technical Report | TR-374: YANG Modules for Management of G.hn Systems in FTTdp Architectures | Common YANG | In Force | TR-374 | 2018/06 | More | ||
TR-115i3a1 | Technical Report | TR-115 Issue 3 Amendment 1: VDSL2 Functionality Test Plan | Physical Layer Transmission (PHYtx) | In Force | TR-115i3 / TR-115i3a1 / TR-115i3a2 | 2018/05 | |||
TR-114i3a2 | Technical Report | TR-114 Issue 3 Amendment 2: VDSL2 Performance Test Plan | Physical Layer Transmission (PHYtx) | In Force | TR-114i3 / TR-114i3a1 / TR-114i3a2 / TR-114i3a3 / TR-114i3a4 | 2018/05 | ZIP | ||
TR-400 | Technical Report | TR-400: Testing of Bonded, Multi-Pair G.fast Systems | Physical Layer Transmission (PHYtx) | In Force | TR-400 | 2018/05 | |||
TR-416 | Technical Report | TR-416: CloudCO Use Cases and Scenarios | SDN and NFV | In Force | TR-416 | 2018/04 | |||
TR-384 | Technical Report | TR-384: Cloud Central Office (CloudCO) Reference Architectural Framework | SDN and NFV | In Force | TR-384 | 2018/01 | |||
TR-156i4 | Technical Report | TR-156 Issue 4: Using GPON Access in the context of TR-101 | Fiber Access Networks (FAN) | In Force | TR-156i4 | TR-156i3 | 2017/11 | ||
TR-177c1 | Technical Report | TR-177 Corrigendum 1: IPv6 in the context of TR-101 | Access and Transport Architecture (ATA) | In Force | TR-177 / TR-177c1 | 2017/11 | |||
TR-221a2 | Technical Report | TR-221 Amendment 2: Technical Specifications for MPLS in Mobile Backhaul Networks | Access and Transport Architecture (ATA) | In Force | TR-221 / TR-221c1 / TR-221a1 / TR-221a2 | 2017/09 | |||
TR-155i2 | Technical Report | TR-155 Issue 2: GPON ONU requirements for CPE | Fiber Access Networks (FAN) | In Force | TR-155i2 | TR-155 | 2017/09 | ||
TR-178i2 | Technical Report | TR-178 Issue 2: Multi-service Broadband Network Architecture and Nodal Requirements | Fiber Access Networks (FAN) | In Force | TR-178i2 | TR-178 | 2017/09 | ||
TR-287i2 | Technical Report | TR-287 Issue 2: PON Optical-Layer Management | Fiber Access Networks (FAN) | In Force | TR-287i2 | TR-287 | 2017/09 | ||
MR-404 | Marketing Report | MR-404: Traffic Management in Multi-Service Access Networks | In Force | MR-404 | 2017/09 | ||||
TR-328 | Technical Report | TR-328: Virtual Business Gateway | SDN and NFV | In Force | TR-328 | 2017/07 | |||
TR-114i3a1 | Technical Report | TR-114 Issue 3 Amendment 1: VDSL2 Performance Test Plan | Physical Layer Transmission (PHYtx) | In Force | TR-114i3 / TR-114i3a1 / TR-114i3a2 / TR-114i3a3 / TR-114i3a4 | 2017/05 | |||
TR-140a3 | Technical Report | TR-140 Amendment 3: TR-069 Data Model for Storage Service Enabled Devices | Broadband User Services (BUS) | In Force | TR-140a3 | TR-140a1 | 2017/05 | More | |
TR-390 | Technical Report | TR-390: Performance Measurement from IP Edge to Customer Equipment using TWAMP Light | Access and Transport Architecture (ATA) | In Force | TR-390 | 2017/05 | |||
ATP-069i2c1 | Abstract Test Plan | ATP-069 Issue 2 Corrigendum 1: TR-069 Abstract Test Plan | Broadband User Services (BUS) | In Force | ATP-069i2c1 | ATP-069i2 | 2017/05 | ||
TR-114i3 | Technical Report | TR-114 Issue 3: VDSL2 Performance Test Plan | Physical Layer Transmission (PHYtx) | In Force | TR-114i3 / TR-114i3a1 / TR-114i3a2 / TR-114i3a3 / TR-114i3a4 | TR-114i2 | 2017/03 | ZIP | |
TR-298i2 | Technical Report | TR-298 Issue 2: Management model for DSL line test | Fiber to the Distribution Point | In Force | TR-298i2 | TR-298 | 2017/03 | ||
MR-363 | Marketing Report | MR-363: Home Network Diagnostics Tools and Mechanisms | In Force | MR-363 | 2017/03 | ||||
TR-273a1 | Technical Report | TR-273 Amendment 1: Testing of Bonded, Multi-Pair xDSL Systems | Physical Layer Transmission (PHYtx) | In Force | TR-273 / TR-273c1 / TR-273a1 | 2016/10 | |||
TR-345 | Technical Report | TR-345: Broadband Network Gateway and Network Function Virtualization | Access and Transport Architecture (ATA) | In Force | TR-345 | 2016/10 | |||
TR-356 | Technical Report | TR-356: Alternate Management Path for Broadband | Broadband User Services (BUS) | In Force | TR-356 | 2016/10 | |||
TR-359 | Technical Report | TR-359: A Framework for Virtualization | Access and Transport Architecture (ATA) | In Force | TR-359 | 2016/10 | |||
MR-276 | Marketing Report | MR-276: Lessons Learned from IPv4 to IPv6 Migration and Guidance for Future Deployment | In Force | MR-276 | 2016/10 | ||||
TR-341 | Technical Report | TR-341: Radius Attributes Catalog | Wireless Wireline Convergence (WWC) | In Force | TR-341 | 2016/07 | |||
TR-348 | Technical Report | TR-348: Hybrid Access Broadband Network Architecture | Wireless Wireline Convergence (WWC) | In Force | TR-348 | 2016/07 | |||
TR-349 | Technical Report | TR-349: DSL Data Sharing | Access and Transport Architecture (ATA) | In Force | TR-349 | 2016/07 | |||
TR-371 | Technical Report | TR-371: G.fast Vector of Profiles (VoP) Managed Object Structure | Fiber to the Distribution Point | In Force | TR-371 | 2016/07 | |||
TR-317 | Technical Report | TR-317: Network Enhanced Residential Gateway | Access and Transport Architecture (ATA) | In Force | TR-317 | 2016/07 | |||
MR-311 | Marketing Report | MR-311: Overview of Fiber Infrastructure Management Systems | In Force | MR-311 | 2016/07 | ||||
TR-319pB | Technical Report | TR-319pB: Achieving Packet Network Optimization using DWDM Interfaces – Physically Separated Model | Access and Transport Architecture (ATA) | In Force | TR-319pB | 2016/04 | |||
TR-115i3 | Technical Report | TR-115 Issue 3: VDSL2 Functionality Test Plan | Physical Layer Transmission (PHYtx) | In Force | TR-115i3 / TR-115i3a1 / TR-115i3a2 | TR-115i2 | 2016/01 | ZIP | |
TR-321 | Technical Report | TR-321: Public Wi-Fi Access in Multi-service Broadband Networks | Access and Transport Architecture (ATA) | In Force | TR-321 | 2015/11 | |||
MR-278 | Marketing Report | MR-278: Managing Machine-to-Machine Systems with CWMP | In Force | MR-278 | 2015/11 | ||||
TR-064i2 | Technical Report | TR-064 Issue 2: LAN-Side CPE Configuration | Broadband User Services (BUS) | In Force | TR-064i2 | TR-064c1 | 2015/08 | ||
TR-131a1 | Technical Report | TR-131 Amendment 1: ACS Northbound Interface Requirements | Broadband User Services (BUS) | In Force | TR-131a1 | TR-131 | 2015/08 | ||
TR-133c1 | Technical Report | TR-133 Corrigendum 1: TR-064 Extensions for Service Differentiation | Broadband User Services (BUS) | In Force | TR-133c1 | 2015/08 | |||
TR-105i2a2 | Technical Report | TR-105 Issue 2 Amendment 2: ADSL2/ADSL2plus Functionality Test Plan | Physical Layer Transmission (PHYtx) | In Force | TR-105i2 / TR-105i2a1 / TR-105i2a2 | 2015/06 | |||
TR-292 | Technical Report | TR-292: Abstract Test Suite For MPLS OAM | IPMPLS & Core | In Force | TR-292 | 2015/06 | |||
TR-319Base | Technical Report | TR-319Base: Achieving Packet Network Optimization using DWDM Interfaces | IPMPLS & Core | In Force | TR-319Base | 2015/06 | |||
TR-319pA | Technical Report | TR-319pA: Achieving Packet Network Optimization using DWDM Interfaces – Physically Integrated Model | IPMPLS & Core | In Force | TR-319pA | 2015/06 | |||
TR-242i2 | Technical Report | TR-242 Issue 2: IPv6 Transition Mechanisms for Broadband Networks | Access and Transport Architecture (ATA) | In Force | TR-242i2 | TR-242 | 2015/02 | ||
TR-304 | Technical Report | TR-304: Broadband Access Service Attributes and Performance Metrics | Operations & Network Management | In Force | TR-304 | 2015/02 | |||
TR-311 | Technical Report | TR-311: Fiber Infrastructure Management System: Architecture and Requirements | Operations & Network Management | In Force | TR-311 | 2015/02 | |||
TR-100i3a1 | Technical Report | TR-100 Issue 3 Amendment 1: ADSL2/ADSL2plus Performance Test Plan | Physical Layer Transmission (PHYtx) | In Force | TR-100i3 / TR-100i3a1 | 2015/02 | |||
TR-197i2 | Technical Report | TR-197 Issue 2: DQS: DSL Quality Management Techniques and Nomenclature | Operations & Network Management | In Force | TR-197i2 | TR-197 | 2014/12 | ||
TR-138a1 | Technical Report | TR-138 Amendment 1: Accuracy Tests for Test Parameters | Physical Layer Transmission (PHYtx) | In Force | TR-138 / TR-138c1 / TR-138a1 | 2014/09 | |||
TR-273c1 | Technical Report | TR-273 Corrigendum 1: Testing of Bonded, Multi-Pair xDSL Systems | Physical Layer Transmission (PHYtx) | In Force | TR-273 / TR-273c1 / TR-273a1 | 2014/09 | |||
TR-293 | Technical Report | TR-293: Energy Efficient Mobile Backhaul | IPMPLS & Core | In Force | TR-293 | 2014/09 | |||
TR-221c1 | Technical Report | TR-221 Corrigendum 1: Technical Specifications for MPLS in Mobile Backhaul Networks | IPMPLS & Core | In Force | TR-221 / TR-221c1 / TR-221a1 / TR-221a2 | 2014/09 | |||
TR-100i3 | Technical Report | TR-100 Issue 3: ADSL2/ADSL2plus Performance Test Plan | Physical Layer Transmission (PHYtx) | In Force | TR-100i3 / TR-100i3a1 | TR-100i2 | 2014/09 | ||
TR-224 | Technical Report | TR-224: Technical Specification for MPLS in Carrier Ethernet Networks | IPMPLS & Core | In Force | TR-224 | 2014/09 | |||
TR-300 | Technical Report | TR-300: Policy Convergence for Next Generation Fixed and 3GPP Wireless Networks | Access and Transport Architecture (ATA) | In Force | TR-300 | 2014/09 | |||
TR-330 | Technical Report | TR-330: TR-069 UPnP DM Proxy Management Guidelines | Broadband User Services (BUS) | In Force | TR-330 | 2014/08 | |||
TR-320 | Technical Report | TR-320: Techniques to Mitigate Uncancelled Crosstalk on Vectored VDSL2 Lines | Physical Layer Transmission (PHYtx) | In Force | TR-320 | 2014/03 | |||
TR-104i2 | Technical Report | TR-104 Issue 2: Provisioning Parameters for VoIP CPE | Broadband User Services (BUS) | In Force | TR-104 / TR-104i2 | 2014/03 | More |